Pavement Rehabilitation and Upgrading of Qift El-Quseir Road from Two-Lane to Four – Lane Highway, Red Sea – Length of 90 km

Services

• Topographic survey,
• Geological studies,
• Geotechnical investigations,
• Hydrology design/flood protection,
• Realignment in the mountainous region taking into consideration
the major water crossings that cross through the mountains,
• Detailed geometric design,
• Pavement rehabilitation design of existing road,
• Structural design of pavement widening.

Client:

General Authority for Roads and Bridges, Ministry of Transport

Localization:

Red Sea Governorate, Egypt

Date:

2020-2023

Services

Client:

General Authority for Roads and Bridges, Ministry of Transport

Localization:

Red Sea Governorate, Egypt

Date:

2020-2023

Get a free Quote

Let’s experience the power of the sun