High Speed Rail (Green Line from Ain ElSokhna to Marsa Matrouh)- Section Three (West of Nile to Wadi El-Natroun) – Length of 125 km

Services

  • Geological studies,
  • Geotechnical investigations,
  • Hydrology/flood protection design,
  • Alignment design,
  • Study the relocation of the utilities (water, wastewater, oil and gas
    pipelines),
  • Coordination with gas and other utility companies and with the
    Government to reach to optimum HSR path,
  • Detailed design of the final Alignment.

Client:

General Authority for Roads and Bridges, Ministry of Transport

Localization:

From West of Nile to Wadi ElNatroun - Egypt

Date:

2020 - 2023

Services

Client:

General Authority for Roads and Bridges, Ministry of Transport

Localization:

From West of Nile to Wadi ElNatroun - Egypt

Date:

2020 - 2023

Get a free Quote

Let’s experience the power of the sun