• The area of the complex is 1,285 m2,
• Geodetic survey and geotechnical investigations,
• Site analysis and review of GARB regulations,
• Architectural, structural, plumbing, electrical design and working drawings,
• Preparation of the BOQ and tender documents,
• Supervision of construction works.