• Settlement problems at three locations were reported,
• Propose alternatives to solve the settlement problems,
• Detailed design of storm drainage network,
• 2D hydrodynamic modeling,
• Preparation of bill of quantities.
• Approval from Ministry of Water Resources and Irrigation.