Flood Protection System for High-Speed Rail (Section Three) from West of Nile to Wadi El- Natroun – Length of 125 km

Services

• Flood protection,
• Detailed design of storm drainage network,
• 2D hydrodynamic modeling,
• Approval from Ministry of Water Resources and Irrigation,
• Construction supervision.

Client:

General Authority for Road and Bridges (GARB), National Authority of Tunnels (NAT)

Localization:

From West of Nile to Wadi ElNatroun - Egypt

Date:

2021- Date

Services

Client:

General Authority for Road and Bridges (GARB), National Authority of Tunnels (NAT)

Localization:

From West of Nile to Wadi ElNatroun - Egypt

Date:

2021- Date

Get a free Quote

Let’s experience the power of the sun