Pavement Rehabilitation and Upgrading of Mansoura Damietta Eastern Road – Phase 2 – from Talkha to Sherbeen and Phase 3 from Sherbeen to Damietta – Length of 51 km

Services

• Geotechnical investigations,
• Detailed geometric design,
• Pile design for road widening over existing canal,
• Pavement rehabilitation design of existing road,
• Structural design of pavement widening,
• Hydraulic design, stormwater management, and design of
protection works.

Client:

General Nile Company for Road Construction

Localization:

Sherbeen to Damietta, Egypt

Date:

2020-Date

Services

Client:

General Nile Company for Road Construction

Localization:

Sherbeen to Damietta, Egypt

Date:

2020-Date

Get a free Quote

Let’s experience the power of the sun